AKKILA |
1 |
Brown&Root/LEAD |
Thayyem |
Syria |
1986 |
1986 |
Sub-Contractor |
Sand |
2 |
Mitsubishi/LEAD |
Baniyas |
Syria |
1987 |
1988 |
Sub-Contractor |
Sand |
3 |
Brown&Root/LEAD |
2 |
Syria |
1988 |
1988 |
Sub-Contractor |
Coating |
4 |
Brown&Root/LEAD |
Sijan |
Syria |
1988 |
1990 |
Sub-Contractor |
Coating |
5 |
Techno-Export/LEAD |
Omar |
Syria |
1988 |
1990 |
Sub-Contractor |
Sand |
6 |
Brown&Root/LEAD |
Tanak. |
Syria |
1989 |
1989 |
Sub-Contractor |
Sand |
7 |
Davy |
Omar |
Syria |
1989 |
1989 |
Sub-Contractor |
Sand |
8 |
Mannesman/LEAD |
Gas |
Syria |
1989 |
1989 |
Sub-Contractor |
Sand |
9 |
John |
Omar |
Syria |
1989 |
1990 |
Sub-Contractor |
Sand |
10 |
Brown&Root/LEAD |
Omar |
Syria |
1990 |
1991 |
Sub-Contractor |
Sand |
11 |
Petrofac/LEAD |
Omar |
Syria |
1992 |
1993 |
Sub-Contractor |
Sand |
12 |
Sudrohbau/LEAD |
Jafra |
Syria |
1992 |
1993 |
Sub-Contractor |
Sand |
13 |
TITAN |
Palmyra |
Syria |
1994 |
1995 |
Sub-Contractor |
Sand |
14 |
BAKER |
Inspection |
Syria |
1995 |
1997 |
Sub-Contractor |
Welding |
15 |
SD |
Tank Cleaning Project at T-4 Pump Station |
Syria |
1997 |
1998 |
Sub-Contractor |
Clean |
16 |
ANSALDO |
Sewage |
Syria |
1997 |
1998 |
Sub-Contractor |
Construction |
17 |
GAMA QATAR CO. |
UMM-BAB, QATAR 4000tpd CEMENT PLANT N˚3 |
Qatar |
2005 |
2006 |
Sub-Contractor |
Non-Destructive Testing Services |
18 |
SHAPADU Energy& Eng. |
PGU Loop-1 Project |
Malaysia |
1997 |
1998 |
Sub-Contractor |
Supplying mech’l. & welding manpower & their management staff. |
19 |
TMC |
ASAB/Thamama Gas Injection Pilot Project |
UAE |
2001 |
2002 |
Sub-Contractor |
Coating, steel structure and vessels Painting works. |
20 |
Al |
5 |
UAE |
2002 |
2003 |
Sub-Contractor |
Conducted |
21 |
Al-Fujairah |
UAE |
2002 |
2004 |
Sub-Contractor |
Repair |
|
22 |
SAMSUNG |
Al-Dhafra |
UAE |
2003 |
2004 |
Sub-Contractor |
Welding |
23 |
Babcock |
Taweelah |
UAE |
2003 |
2005 |
Sub-Contractor |
Welding |
24 |
Total |
Taweelah |
UAE |
2003 |
2005 |
Sub-Contractor |
Welding |
25 | 256 km 12″ P/L and 4 units Oil Storage Tanks 60m dia. |
Sudan |
2004 |
2006 |
Sub-Contractor |
Welding, |
|
26 |
Al Taweelah New B Extension Project |
UAE |
2006 |
2007 |
Sub-Contractor |
MErection of 3 units Storage Tanks (40m dia. x 20.3m height) Dome Roof design |
|
27 |
SPC |
Homs Refinery Storage Tanks |
Syria |
2006 |
2007 |
Sub-Contractor |
Fabrication and erection of 2 Oil Storage Tanks (18 m dia. x 10 m height), piping related and civil foundation works |
28 |
Jebel Ali Power & Desalination Station ‘L’ – Phase II Storage Tank Erection |
UAE |
2006 |
2007 |
Sub-Contractor |
Erection of 2 Units Carbon Steel (30 m dia.) and 2 Units Stainless Steel (18 m dia.) Storage Tanks. |
|
29 |
Blasting and Painting Works for Habshan OGD III Project |
UAE |
2006 |
2009 |
Sub-Contractor |
Blasting and Painting of 51,000 Linear meters piping, supports & fittings using full system and touch up for 6,000m2 equipment. |
|
30 |
Tank Erection Works for Common Sulfur Plant & Common Cooling Sea Water System Phase-II Project |
Ras Laffan, Qatar |
2007 |
2009 |
Sub-Contractor |
Welding/Tank Erection of 2 units Molten Sulfur Storage Tanks (31m dia. x 10m height), 1 unit Process Water Tank (12.3m dia. x 12.2m height) & 1 unit Fire Water Tank (14m dia. x 9m Ht). |
|
31 |
TAPCO
|
Taweela A10 Power Plant |
UAE |
2007 |
2008 |
Sub-Contractor |
Material handling, fabrication & rolling, erection, welding, dimensional check, hydrotesting and painting of 1 unit CS Fuel Storage Tank (29.7m dia. x 16.5m height) |
32 |
CHW External Pipes Network – Burj Dubai Development Project |
UAE |
2008 |
2009 |
Sub-Contractor |
Laying & erection of underground piping including supervision of CS Water External Network Pipes, welding of various pipe sizes, hydrotesting, visual inspection & provision of related QA/QC works. |
|
33 |
DN 200 PN 160 CS Pipeline Jebel Hafeet from Base Pumping Station to Summit Reservoir |
UAE |
2009 |
2011 |
Sub-Contractor |
Bending,Laying, Erection and Coating of DN 200 PN 160, Pipeline from Jebel Hafeet Base Pumping Station to Summit Reservoir and DN 150 Pn 140 Pipeline from Summit Reservoir to the Palace Tanks. Al Ain. |
|
34 |
ADWEA/TRANSCO |
Umm Al Nar “B” Pumping Station Extension, (Completion of Project No. 2861) Tender No. N-6043 |
UAE |
2010 |
2012 |
Sub-Contractor |
Engineering, Procurement, Fabrication, Construction and Commsioning of Pump Station Extension Facilities icluding 2 Pumps and 2 Surge Vessels. |
35 |
TAKREER / SINOPEC |
Construction of Oil Terminal Hamriyah Free Zone EPC-1 Project |
UAE |
2012 |
2013 |
Sub-Contractor |
Procurement, fabrication, sandbalsting, painting and supply of tank fittings and accessories including roof structures. |
36 |
TAKREER / TD Williamson Middle East |
Hot Tap Welding Services in Takreer RRE Project |
UAE |
2013 |
2014 |
Sub-Contractor |
Welding Procedure/Welder Performance Qualification Tests, related NDT and Destructive Tests and to provide fully equipped Welding Team for welding services of Hot Tapping Works. |
37 |
ADAC / PCE JV |
Midfield Terminal Building, Abu Dhabi International Airport Project |
UAE |
2014 |
Present |
Sub-Contractor |
Erection and fabrication with necessary welding & grooving, header pressure testing, installation of heavy structure support with painting and bolting for the Chilled Water Piping Works. |